How it works

From a free home visit to a signed-off room.

Our own trades run every stage, with an approved building inspector signing off each step.

  1. 1

    Stage 01

    Free call or WhatsApp

    Call, WhatsApp or send the form. Tell us about the garage and what you want it to be.

  2. 2

    Stage 02

    Free home visit and quote

    A project manager visits, checks the floor, walls, roof, boiler and meters, and gives you a free quote.

  3. 3

    Stage 03

    Building notice submitted

    We submit the building notice and book an approved inspector. In most cases no planning permission is needed.

  4. 4

    Stage 04

    Strip out and structural work

    The garage door comes out, the new wall and window go in, and the floor is damp-proofed and raised.

  5. 5

    Stage 05

    Insulation and services

    Walls and ceiling are insulated, and electrics, heating and plumbing are run. Inspections happen at each stage.

  6. 6

    Stage 06

    Plastering and second fix

    Plastering, skimming, flooring, doors and finishes. Boilers and meters are boxed in with access doors.

  7. 7

    Stage 07

    Building control compliance certificate

    The inspector issues the compliance certificate, which you keep for when you sell.

  8. 8

    Stage 08

    Handover of your new room

    You get the keys to a real room. A standard single garage usually takes 7 to 12 days, a double 12 to 16.

Garage Conversion Company of the Year 2025/26

Start with a free home visit

Tell us about the garage and what you want it to be. A project manager comes round, checks it over and gives you a free quote.